From the 2024/25 heating period on, about 20,000 households in Hamburg are to be supplied with CO2-free industrial heat generated by a secondary process of copper production at Aurubis.
From the 2024/25 heating period on, about 20,000 households in Hamburg are to be supplied with CO2-free industrial heat generated by a secondary process of copper production at Aurubis. In this way, up to 100,000 tonnes of CO2 emissions each year can be saved in the Hanseatic city from 2025 on. The intended heat supply constitutes the largest use of industrial heat in Germany.
